Scope of Work:
It is Mile stone Project and a Lead experience took place in Iraq , and achieved in Dujaila River / Kut city with Total Length about 350 M.L, it speaks about lining the rivers with Concrete Mattress with water presence and without even need to make any intersection or Side Diversions . through the following Steps:
- Cleaning of Sections.
- Excavation about 2000 m³.
- Filling with Deem soil 3000 m³.
- Filling with crushed stone 200m³.
- Construction of key 160m³.
- Supply of 15000.
- Supply of synthetic filter 15000.